From the
organisers of
Hillhead logo

New Mountsorrel concrete batching plant

Mountsorrel concrete batching plant

Mick George Ltd invest in state-of-the-art plant to boost concrete service provision in Leicestershire

MICK George Ltd have installed a brand-new Fast 2500 B Firenze ready-mixed concrete plant, capable of batching up to 100 cubic metres per hour, at their Mountsorrel site in Leicestershire.

The state-of-the-art Cifa by Euromecc-designed plant features the latest batch-control system, a twin-shaft mixer, three 100-tonne silos, moisture probes and galvanized aggregate storage bins.

 

Although Mick George operate a fleet of more than 30 truckmixers for deliveries throughout Leicestershire, the new batching plant also facilitates concrete collections in minutes, thereby reducing any interruption to the working schedules of local tradesmen.

Two of Mick George’s 40+ sites are located in the Leicestershire area, providing comprehensive skip hire, aggregates and commercial waste services to residential, trade and commercial clients in and around the county.

Mick George Ltd’s managing director, Michael George, commented: ‘Leicestershire is increasingly becoming one of our core territories for many of our main services as we continue to grow geographically.

‘We have high aspirations for our concrete service in Leicestershire and to achieve them we recognize that we need to suitably invest in the necessary areas. We’re confident that the new plant will provide local tradesmen with the quality concrete that they have come to expect.’

 

Latest Jobs