OP15 - Landfill Engineering (including Cell Preparation, Capping And Other Structures)

The purpose of this document is to prepare procedures to ensure that all planning, licensing and other relevant requirements are identified and followed when preparing an area/cell/phase of landfill, capping or the installation of other engineered landfill structures.